Business Rules - Manufacturing
This document lists the core business rules of the Manufacturing domain, each with a unique BR-NNN code. Every rule is technology-independent and describes an invariant constraint on the behaviour of the domain.
---
BR-001 - Production order bound to a released bill of materials
Code: BR-001
Name: Every ProductionOrder references a BOM in released state
Description: A ProductionOrder cannot start without an approved BOM (bill of materials) in released state. The BOM determines the materials, routing steps and work centers involved.
Rationale: Ensure repeatability and traceability of production; avoid starts with undefined materials or steps.
Priority: HIGH
Actors: Production Planner, Operator
Traceability: glossary.md BOM; state-machines/production-order-lifecycle.md.
---
BR-002 - OEE aggregated from raw inputs, never product of averages
Code: BR-002
Name: The OEEMeasurement is computed by summing raw numerators and denominators
Description: Aggregated Overall Equipment Effectiveness must be obtained by summing raw times and counts (availability, performance, quality) and computing the overall ratio, not by multiplying already-aggregated partial averages.
Rationale: Avoid statistical distortion of OEE across periods or multiple lines (D-37-03-OEE-AGG).
Priority: HIGH
Actors: Production Planner, Maintenance Engineer
Traceability: glossary.md OEE; D-37-03-OEE-AGG; events/domain-events.md OEEComputed.
---
BR-003 - Non-conformance blocks batch release
Code: BR-003
Name: An open NonConformance prevents closing the ProductionOrder
Description: When a NonConformance on product or process is detected, the associated batch cannot be released until the non-conformance is resolved or dispositioned (rework, scrap, documented concession).
Rationale: Prevent release of non-conforming product; preserve system conformance per ISO 9001 clause 8.7 (control of nonconforming outputs).
Priority: CRITICAL
Actors: Quality Inspector, Production Planner
Traceability: ISO 9001 clause 8.7 (by clause, not verbatim); events/domain-events.md NonConformanceDetected.
---
BR-004 - Quality inspection before closure
Code: BR-004
Name: Every ProductionOrder passes quality control before closure
Description: Before transitioning to closed, the order must pass the planned quality inspection. The outcome (ISO9001InspectionPassed or non-conformance) is recorded and traceable.
Rationale: Ensure product conformance to defined requirements, aligned with ISO 9001 clause 8.6 (release of products and services).
Priority: HIGH
Actors: Quality Inspector
Traceability: ISO 9001 clause 8.6 (by clause); events/domain-events.md ISO9001InspectionPassed.
---
BR-005 - Monetary values as integers, quantities as integers
Code: BR-005 Name: Costs in integer cents, quantities in integer units Description: All domain monetary values (material cost, scrap cost) are integer cents; produced, scrapped and stocked quantities are integer units. No monetary value or quantity is floating point. Rationale: Avoid rounding errors in cost and yield calculations (D-37-03-INT). Priority: MEDIUM Actors: Production Planner Traceability: D-37-03-INT; glossary.md (yield, scrap).
---
BR-006 - Machine downtime recorded and attributed
Code: BR-006
Name: Every MachineDowntime is classified and attributed to a cause
Description: Every stoppage of a WorkCenter must be recorded with duration and cause (breakdown, set-up, material shortage, planned maintenance). Downtime feeds the availability component of OEE.
Rationale: Enable loss analysis and data-driven maintenance; correctly feed OEE.
Priority: HIGH
Actors: Operator, Maintenance Engineer
Traceability: glossary.md OEE (availability); events/domain-events.md MachineDowntime.
---
BR-007 - Quality audits at planned intervals
Code: BR-007
Name: The quality system is subject to planned internal audits
Description: Internal audits of the quality management system must be conducted at planned intervals and their outcomes recorded; system non-conformances generate tracked corrective actions.
Rationale: Maintain the effectiveness of the quality system, consistent with ISO 9001 clause 9.2 (internal audit).
Priority: MEDIUM
Actors: Quality Inspector
Traceability: ISO 9001 clause 9.2 (by clause); events/domain-events.md QualityAuditCompleted.
---
BR-008 - Significant environmental aspects monitored
Code: BR-008
Name: Significant environmental aspects of the process are identified and monitored
Description: The production process must identify significant environmental aspects (consumption, emissions, waste) and monitor their indicators, integrating quality control with environmental control.
Rationale: Manage environmental impacts consistent with ISO 14001 clause 6.1.2 (environmental aspects).
Priority: MEDIUM
Actors: Quality Inspector, Maintenance Engineer
Traceability: ISO 14001 clause 6.1.2 (by clause, not verbatim); events/domain-events.md ScrapRecorded.
---